I've been working off and on, on this well site facility. I initially had 3 tank batteries, 3 treaters and three meters. The production company decided to add 3 more of each. So now there will be a total of 6 treaters, 6 tank batteries, and 6 meter buildings. I had to make the meter buildings all accessible to the pumper, so he could drive up, hope out and walk to each meter building. This is kind of fun today.