Let's see I have about three weeks to do the following for EJS'05.
Install WJ Brake booster/cyclinder/some new hardlines/ flush all the crap out
Install front/rear steel braided lines
Install new RE 5.5" front springs/ RE 4.5" spring packs w/ M.O.J.O. shackles
Install RE GEN2 discos
Install RE mono shocks w/ remote res. for the front/ RE monos for the rear
Need a windshield for the IM/Saftey legal crap
Fix the ^&**^%^%@!! e-fan again!!
Install ZJ tierod stuff
Get the front driveline rebuilt? Hmm will the rear one be fine? Make a roof rack so I don't have a 33" MTR in the back of my head?
Fix the $^&&*&^& electric windows!
Change the oils. Crap I need to call in sick for the next 1-2 weeks.
Install WJ Brake booster/cyclinder/some new hardlines/ flush all the crap out
Install front/rear steel braided lines
Install new RE 5.5" front springs/ RE 4.5" spring packs w/ M.O.J.O. shackles
Install RE GEN2 discos
Install RE mono shocks w/ remote res. for the front/ RE monos for the rear
Need a windshield for the IM/Saftey legal crap
Fix the ^&**^%^%@!! e-fan again!!
Install ZJ tierod stuff
Get the front driveline rebuilt? Hmm will the rear one be fine? Make a roof rack so I don't have a 33" MTR in the back of my head?
Fix the $^&&*&^& electric windows!
Change the oils. Crap I need to call in sick for the next 1-2 weeks.
Last edited: