With a massive list of things that Jacey and I would like to do with tax returns and savings, finishing the basement has won out. I'm stoked to have a usable basement, as it will double our comfortable living space. The basement already has one room that is 95% finished, and pipes in place for what looks like a 1/2 bath. We will add one more bedroom, a laundry room with tons of cabinets and storage, a huge family/TV room, reading nook with a wood burning stove, and a closet or two.
We'll be adding 4-5 walls, several outlets and light switches, fixing some insulation, looking at making the 1/2 bath a 3/4 bath, and everything that goes along with finishing a basement... lots of drywall..
I'll add photos of what it looks like now to create the base for update photos as we get going closer to June. I'll be using this thread to ask a lot of questions and get help from those of you who know more about this than me. I'll add that we are having my brother in law heading up the project, as he's done many a basements and other projects; including helping us build our dance studio. As of now we are not planning to hire out any of the work. That may change down the road as we get into the thick of the work.
Here's version 1.2 of the basement floorplan
We'll be adding 4-5 walls, several outlets and light switches, fixing some insulation, looking at making the 1/2 bath a 3/4 bath, and everything that goes along with finishing a basement... lots of drywall..
I'll add photos of what it looks like now to create the base for update photos as we get going closer to June. I'll be using this thread to ask a lot of questions and get help from those of you who know more about this than me. I'll add that we are having my brother in law heading up the project, as he's done many a basements and other projects; including helping us build our dance studio. As of now we are not planning to hire out any of the work. That may change down the road as we get into the thick of the work.
Here's version 1.2 of the basement floorplan
Last edited: