Well all done turned out pretty well, only beef for some reason they first two sections I did are a lot darker. I mixed the batches as instructed so no idea what caused it. Only other issues was a ton of bubbling. I spent quite a bit of time popping them but still had a bunch more pop up.
Three things I learned, muriatic acid is great for prep, the prep stuff that came with the kit didn't etch nearly as well. Spiked shoes are a must, I didn't get them and no one local carried them. I ended up using a set of 3/8 micro hiking spikes that worked fairly well just a bit of a mess now. Third this is a very labor intensive project took me a solid 16 hours, wish I'd had one more day to let caulk cure more and I wish I had caulked the smaller cracks, I thought the epoxy would have covered them.
That said I'm still happy with the result