I drove this Jeep into the shop exactly one week ago yesterday, so far I have completed:
Plated unibody
raised gas tank a metric crap ton
fitted and welded the subframe
T case swap including swapping input shafts
pulled rear axle
14 bolt is in and linked up and done
cut rear wheel wells to hopefully clear 37s
My goal is to to get the front axle pulled and the new 60 in and linked up by this weekend. that leaves me 2 weeks to work through the small stuff before we leave for EJS
The work is done between 7-9 at night after work and 6 hour days on the weekends.
Plated unibody
raised gas tank a metric crap ton
fitted and welded the subframe
T case swap including swapping input shafts
pulled rear axle
14 bolt is in and linked up and done
cut rear wheel wells to hopefully clear 37s
My goal is to to get the front axle pulled and the new 60 in and linked up by this weekend. that leaves me 2 weeks to work through the small stuff before we leave for EJS
The work is done between 7-9 at night after work and 6 hour days on the weekends.
Last edited: