time to build the chummins

600414163275cc64cb91a0d0b2fcbe1a.jpg
ram mount is done and the arms cut, need to swap out the hiem joint for a left handed thread an I can get it buttoned up. Rotors should be done next week. Next up mounting the steering column, master cylinder, an orbital,
a0878ac4f00c949be37190ffae758a46.jpg


Sent from my VS986 using Tapatalk
Got the rotors done and everything back on the axles,
353a651218079521179371d255f15c46.jpg


Then pulled the timing cover to take care of the dowel pin,
8f66d7fe331f5d308dfdfe0fa9a5d857.jpg


Next up will be. Brakes and front steering

Sent from my VS986 using Tapatalk
 
172ebb92d371a9f10f491ebdea5445cd.jpg
been awhile but calipers are on, they are for an 2010 ram 1 ton. Also have front ram ready to mount just need to add in some double shear tabs on the arms

Sent from my VS986 using Tapatalk
 
That does look great! Are you going to take the roof off your garage and hoist it out with a crane?
 
got it fixed, there is a little bushing on the end of the axle shaft that has some shims and when i put the planetary back together it fell down and was hanging me up.
 
Back
Top