It's really not that hard. The two lower mounting holes go through the frame, which requires welding in sleeves. The upper needs brackets and a sleeve welded to the frame. The IFS pitman will need to be modified to fit a rod end, but several options are available. Above all, move it forward! I've stretched my front out 1" and would have liked to go further. If I could do it again, I'd notch out the radiator support, and extend the box an inch further forward. Talk to the Rocklogic boys, they know their stuff on this.