funny you should ask.
1 finish aluminum side armor and wetsand body
2 powder coat cage, rockers, gas tank, gas skid, tube fenders, shifter box rear axle and links.
3 modify t case shift boot.
4 buy 5 point harnesses.
5 disasemble rig.
6 take body to paint.
7 paint new half of frame.
8 paint engine cage.
9 install new toque converter.
10 install new winch
11 take body to bedliner.
12 install fuel filler
13 reasemble entire rig.
14 adjust and fill coil-overs.
15 reconnect wiring.
16 Take to exhaust shop for new system.
17 take on test run.
What do you guys think, am I attempting the impossible?