I think the work Steve did for me was quite reasonable.
approx 700 sq ft,
4.5" slab thickness with 12" at the side due to elevation change,
re-bar, not mesh, tied into existing driveway and garage foundation,
removed all sod, existing shrubs, concrete curb, and remains of an old basketball...