Updates
Painting truck 30% done painted hood and fenders today.
Body work on the bed 50% ( remove) bondo to have stock lines
P/S is 90% I need to buy one new hose and plumb it, also need new steering wheel cv joints (broke mine)
I need to rebuild my front hubs 90% I need to find a new little spring that goes with the bearing.. it was missing
Rebuild Brake calipers 10% I bought the rebuild kit and pads
Hook up brake lines and bleed them
Mount gas tank and pressurize tank 50% need to just bolt it up
Make new front drive line 40% Have metal and joints just need to put it together
Put in new windshield, have one just need it in
Finish floor, 80% need to seal floor I already bought it, need herciliner
Mount seats and harnesses 50%
build rear bumper,
Mount sliders and interior cage
Buy shocks and mount front hoops and figure out the rear mounts
figure out my tire and rim situation....
And of coarse all new fluids...
Gear oil,brake,steering,clutch
I think that's it... I need to get it done. I just need like 3 full days of work and it could be done but it hard with school, work, and the new wife
My goal is to have it done no later than October 2nd