Okay, here's the explaination:
Last Saturday, Shawn and I, okay, Shawn, installed my t-case. It was obvious at that point that some semi major work would be required to make the driveshaft work. Since I was planning on going coils after Thanksgiving, I didn't want to do any more work on the leaf suspension, only to remove it 2 months later. So I figured, why not throw the coils on now and put it at 108" the tub was in the way, so I cut it off and rigged up this quick half-assed pipe buggy deal. It will be changed after Thanksgiving. I will also cut the frame at the crossmember at that time.