I have had quite a saga at the house the last few weeks...and today I got to do a lot of work that I planned on doing but not until the fall.
A little back story. We are finally adding on a small extension that will house a new kitchen. It is only 12x20, basement and main level....nothing major. Contractor freaked when he found out the house was brick framed not wood framed with brick veneer. He almost quite. I think he's a little scared and is kind of like a Chevy 350 mechanic having to work on a European engine or something.
New engineering plans were drawn and that made the guy a lot more calm realizing it isn't much different from wood frame when it is being removed either.....just different order of operations.
Anyway, they finally show up on Wed ti start the excavation. We'll apparently he didn't actually measure and his machine is too tall to fit under our carport and steel beams the run from house to property line. This led to much discussion of how to handle it. He decides to rent a smaller machine and have to ramp down to final grade since smaller machine can't dig deep enough at ground level. It was supposed to clear by 1-2". Well apparently he didn't measure the back beam height and still wouldn't make it
I am starting to not like my carport and beams....but wife loves them.
Final solution is to rip out our dilapidated fence on our west side and use the neighbors driveway to get in.
So I planned on replacing the fence this fall. I want to build a retaining wall to help level out our backyard. Now I get to start the project early and in the heat. I started the wall by my shed because that was already higher...but stopped, giving the excavator a good 10' of width to drive up the dirt grade.
I forgot to get a before pic...but it was a very rotted fence that had pickets on both sides.