I started on a cart or dolly for my deionized filtration system yesterday. I’ve been researching and waffling on a system for a few years now as it generally takes me around 2-1/2 hours to wash and chamois my coach. I hope to be able to more than cut that in half. I finally pulled the trigger on the Pro 100 tank/system from DI Rinse.
The tank measures 9” in diameter. I had some 1-1/4” x .095” DOM tubing left over from a previous project and my 1-1/4” die is a 4-1/2” centerline radius so that should be perfect.
Next I decided to bend up another 180-degree hoop in which will go up and back down to the bottom hoop. Thus will allow the tank to actually nestle back into it and merely need a strap to secure it.
Next to the lathe in which to start on the axle assembly.
Im making a couple of tube adapters in which will be welded into another piece of 1-1/4” tube that will be botched and welded to the back of the bottom hoop where the tank will rest.
Parting the tube adapter off.
Chamfering to allow void or channel for weld after pressing into tube.
Tube adapters complete.
Test fit into tube.
I then used a couple of 1/2”-13 x 3” bolts through the tube adapters and the heads welded on the inside on the adapters and welded the adapters into the tube using my MK Products weld positioner and TIG arm rest.
Axle then clamped and welded to the lower hoop.
So far this is where it is at.
Here is the video of my Deionized Filtration Cart Part 1.
More to come, stay tuned.....