Well, everything's hooked up, I just need fluids then I'll take it for a spin around the block.
Mechanical - DONE
- IFS Box mount - done
- Steering Shaft Lengthened - done
- Hydro-assist
- PS pump mountend - done
- Install twin-stick & triple-drilled flanges
Exterior
- build gas tank mounts - done
- new bed mounts
- Brakes - manual prop valve and extended lines - done
- Fix and re-torque pass-side hub - done
- shorten rear DS
- get front DS done (take measurements with it flexed out)
- New Exhaust
- fix the fuses I smashed with a hammer
- new windshield
- Shocks and shock mounts
- extend fuel lines to reach the new fuel tank location - done
- herculine the underside of the tunnel - done
- Herculine tunnel
- seam seal rear sheet metal, tunnel, and inner fenders
- Weld up the lower inner fenders
Interior
- clearance horseshoe collar - done
- tranny/tcase flat belly mount - done
- Tranny tunnel install - done
- Replace back of cab - done
- Floor Install - done
- Seat install
- Fender Tub - done
- Put Dash back together
- Install heater lines - done
Not absolute necessities
- Figure out how to hook up ebrake (not a priority before 9/10/10), possibly add taco rear drums
- bed bob
- modify carb to run at steep angles.
Notes of things to check before driving it.
- trany - fluid
- t-cases - fluid
- Gas - done
- Radiator/Heater - Atifreeze - done
- Brake (bleed)
- Steering (bleed) - done
- front diff - fluid
- check rear diff fluid
- check oil level - done
- check Alt upper bracket bolt torque