I'm having a new patio poured next week. It's 46x14 and with tear out of the old and a pump truck I'm paying 3400.00 for the job.
earls concret is who is doing mine.
I have been getting my tanks filled at Airgas, but there is new Federal regs on co2 and the tanks have to be drained of co2, pressure checked then filled it takes a week to have this done.
I used to a work a week of days then a weeks of nights 12 hours a day for 5 days. Money was good but after 5 yrs of it I had to quit. It took me about a 1-1/2 to get my sleep schedule back on track and I lost weight with out doing anything different plus I felt better mentally.
Check that the trackbar is not worn out, or starting to. I have had a few rides that only certain bumps would make the front end shake like hell and it's always been my trackbar.
I am going to take out my pontoon boat to Strawberry 5/28 and fish Chicken creek East. If any one wants to come up and fish grab your float tube or pontoon boat. I will be leaving Farmington about 6:00 am to head up there. I will be fly fishing.