Progress has been slow as expected, and when we do get to work on it half the time I forget to take pics. Since the last update, we took the cage and tub off, and Jim painted the tub. We finally got the t-case, and I fab'd up a crossmember and got it mounted. The torque converter is installed, and we set the tub back on. Had to cut a lot out of the floor, but that should be pretty easy to patch back in.
We hope to re-install the cage in the next few days, and then we can put the shocks on and make it a roller! Need to do the floor in the tub, and make a new tunnel.
T-case from the back. We used a couple of Samurai motor mounts on the crossmember. Everything is just above the frame rails, so we will have a flat belly. We had to notch the frame 2" on the passenger side to fit the case.
From the front. Front driveshaft clearance is tight, but everything clears.
The case sticks up through the floor about 3". The seat mounts will be built just above the new tunnel, which will locate the seats perfectly. New Mastercraft seats are on the way!