Last night I was able to finish up the cart for my tube roller as it's been sitting incomplete on the fabrication table for a couple of weeks now as I've addressed other priorities.
First items was to fabricate a guide for the handle. I took a piece of 1.5" square tubing, trimmed it to length and then cut one side off and flared the edges to guide the handle into the center as it is raised.
I noticed that the handle would slightly catch when raising so I took it to the disc sander and put a radius on the end.
After the paint dried I bolted the tube roller to the cart permanently.
While I was waiting for the paint to dry I began machining the bungs to be used to bolt the die pegs to the base of the cart. These have a small step machined into them to fit into .750" tubing and accept a 1/4" socket head fastener.
One down, four more to go.
This should work.
Handle paint dried and installed as well as the handles and grips installed onto the handle.
More to follow.
First items was to fabricate a guide for the handle. I took a piece of 1.5" square tubing, trimmed it to length and then cut one side off and flared the edges to guide the handle into the center as it is raised.
I noticed that the handle would slightly catch when raising so I took it to the disc sander and put a radius on the end.
After the paint dried I bolted the tube roller to the cart permanently.
While I was waiting for the paint to dry I began machining the bungs to be used to bolt the die pegs to the base of the cart. These have a small step machined into them to fit into .750" tubing and accept a 1/4" socket head fastener.
One down, four more to go.
This should work.
Handle paint dried and installed as well as the handles and grips installed onto the handle.
More to follow.