BACK TO THE CRD 60 AXELS THEY HAVE BEEN PREHEATED ,SO HERE IS THE PROCESS ,GET THE HOUSING RED HOT THEN WELD THEN. USING A HAMMER TO COMPRESS THE METAL TOGETHER ,YOU CAN DO ABOUT TWO INCHES AT A TIME .NOW THE COMPLETED WELD WILL KEEP THE TUBE FROM SLIDING OUT AND LEAKING .NOW WE CAN BEAT THE HELL OUT OF IT.
thanks all you guys ill keep those pics updated for sure we are just about done, between my dad and i we only been working on it for 3 months now and hope to be finshed close to the end of the month. (hopefully)
the link mounts are a design at the shop BENHANKSRACING we use them on are builds and also sell them for your use on your own project and all the other brackect have been design using card board templets cut to fit then cut out of metal (fabricated)
as far as the rocker panel went we started with a cool looking panel but we decide to go all the way and just boat side it so here is what we went through,
now that the old floor is out, in with the new we had rmss bend us up the plate to put on we started by drilling holes to plug weld the side to the jeep, then when finished they will be grinded smooth.